From 3 km overland conveyors and 10,000 DWT jetties to mining camps, process plants and hauling roads, Rexline delivers engineering, fabrication and project execution across Indonesia and selected international markets.

EPCMiningMarineIndustrialInfrastructureMade in Indonesia
Project Showcase Video
35+
Projects Delivered
750+
Engineers & Experts
10+
Provinces
500t
Monthly Fabrication
Engineering · Procurement · Construction · Management
KalimantanSulawesiSumateraJavaPapuaNTTTimor Leste
Selected Works

Project Portfolio

Selected EPC, design-and-build, fabrication and engineering-consultancy engagements in Indonesia and Timor-Leste. Select an image to open the gallery. Use the on-screen controls, arrow keys or swipe gestures to navigate.

Conveyor
Sebalang, Lampung

EPC 3 KM Overland Conveyor

950 Tons Fabrication Inhouse · 100% Made in Indonesia · 3 KM Overland Conveyor System
EPC Consultancy
  • Soil Inspection
  • Bill of Quantity for Construction
  • Technical Study & Detailed Engineering Drawing
  • Detailed Design & Specification of the Overland Conveyor
  • Bill of Quantity
  • Complete Conveyor Designing
Fabrication Inhouse · 950 Tons
  • Steelwork
  • Platework
  • Rebar
  • Structure 950 Tons
  • Roller
  • Bracket
  • Pulley
Works On Site
  • Pre-Assembly
  • Anchoring & Installation of Structure
  • Mechanical Installation
  • Electrical Installation
  • Fire Fighting
  • Survey Elevation & Excavation
  • Rebar & Form Works
  • Mobile Batching Plant (Cement, Sand & Gravel)
Conveyor Peripheral
  • Drive System
  • Roller System
  • Belt
  • Weighing System
Engineering Discipline
CivilMechanicalElectricalInstrumentation
Dry Test & Wet Test Commissioning
Infrastructure
Murung Raya, Central Kalimantan

EPC Construction Infrastructure

Workshop & Warehouse Construction · Bore Piling & Brick Foundation Works
EPC Consultancy
  • Soil Investigation
  • Piling Analysis and Structure
  • Plant
  • Drawing (Civil, Mechanical and Electrical)
  • Specification
  • Bill of Quantity
  • Tender Documentation
  • Detailed Engineering Design
Works On Site
  • Pre-Assembly
  • Anchoring & Installation of Structure
  • Mechanical Installation
  • Electrical Installation
Bore Piling & Brick Foundation
  • Elevation & Excavation
  • Rebar & Form Works
  • Truck Mixer Methodology (Cement, Sand & Gravel)
Software
SAP 2000TeklaSolidWorksAutoCADKyroHelixCivil 3DTSO
Engineering Discipline
CivilElectricalMechanicalStructural
Marine
Batu Tuhup, Central Kalimantan

EPC 1.1 KM Barge Loading Conveyor & Jetty Construction

853 Ton Fabrication · 1.1 KM Barge Loading Conveyor + Jetty Construction
EPC Consultancy
  • Topography & Bathymetry
  • Soil Investigation & Piling Analysis
  • Drawing (Civil, Mechanical, and Electrical)
  • Specification & Bill of Quantity
  • Design and Analysis of Jetty
  • BOQ - Quantities & Cost Estimation - Jetty
  • Conveyor System Design - Barge Loading
Fabrication 853 Ton
  • Steelwork & Rebar
  • Piling & Piping
  • Conveyor & Structure
Works On Site
  • Pre-Assembly
  • Anchoring & Installation of Structure
  • Mechanical Installation
  • Electrical Installation
  • Survey Elevation & Excavation
  • Rebar & Form Works
  • Mobile Batching Plant (Cement, Sand & Gravel)
Jetty Works On Site
  • Piling Hammer & Boat Methodology
  • Pile Bracing (Welding)
  • Pile Cap & Fender Installation
  • Platform Installation & Anchoring
Software
SAP 2000TeklaSolidWorksAutoCADKyroHelixCivil 3DTSOSketchUp
Engineering Discipline
CivilElectricalMechanicalStructural
Dry Test & Wet Test Commissioning
Housing
Morowali, Central Sulawesi

EPC Housing Construction

Entire Civil Work On Site · Container Pre-Fab Installation
Container Pre-Fab
  • Rebar
  • Handrail
  • Steelwork
  • Roof work
  • Structural Work
Works On Site
  • Survey Elevation & Excavation
  • Rebar & Form Works
  • Mobile Batching Plant (Cement, Sand & Gravel)
  • Pre-Assembly
  • Anchoring & Installation of Structure
  • Mechanical Installation
  • Electrical Installation
  • Container Pre-Fab Installation
Software
SAP 2000TeklaSolidWorksAutoCADKyroHelixCivil 3DTSOSketchUp
Engineering Discipline
CivilElectricalMechanicalStructural
Marine
Central Kalimantan

10,000 DWT Jetty & 1000 TPH Barge Loading

10,000 DWT Jetty · 1000 TPH Turnkey Conveyor · Large-scale marine infrastructure
EPC Consultancy
  • 10,000 DWT Jetty – Large-scale marine infrastructure delivery
  • River Jetty Specialists – Engineered for Kalimantan's soil & currents
  • Dolphins & Mooring – Secure berthing in strong river flow
  • Advanced Fendering – Protection for vessel & structure
  • Mining-Grade Build – Heavy-duty, coal-handling
  • 1000 TPH Turnkey Conveyor – Integrated, high-capacity barge loading system
  • Remote Logistics Mastery – Barge & limited road transport of oversized modules
  • Heavy-Duty Hopper – AR-lined, impact-resistant for mining dump trucks
  • Reinforced Retaining Wall – Soil stability & structural integrity for hopper area
Works On Site
  • Pre-Assembly
  • Anchoring & Installation of Structure
  • Mechanical Installation
  • Electrical Installation
  • Survey Elevation & Excavation
  • Rebar & Form Works
  • Mobile Batching Plant (Cement, Sand & Gravel)
Jetty Works On Site
  • Piling Hammer & Boat Methodology
  • Pile Bracing (Welding)
  • Pile Cap & Fender Installation
  • Platform Installation & Anchoring
Software
SAP 2000TeklaAutoCADHelixCivil 3DSketchUp
Engineering Discipline
CivilElectricalMechanicalStructural
Mining
Indonesia

Gold Mining Development in Indonesia – Feasibility Study

Copper mining and leaching · 3.1 KM Overland Conveyor · GISTM & ICMC Aligned
Crushing Circuit
  • High-availability, scalable throughput
  • Modular design for rapid deployment
  • Integrated dust suppression and environmental controls
Overland Conveyor (3.1 km)
  • Geotechnically optimized, seismic resilient
  • Energy efficient drives, smart monitoring
Grasshopper Conveyor System
  • Agile stockpile management, relocatable design
  • Advanced wear-resistant chutes
Leaching Process
  • State of the art heap leach, containment systems
  • Precision solution management, closure ready
  • GISTM aligned
Earthworks
  • Balanced cut and fill, optimized drainage
  • Geotechnically optimized foundations
Agglomeration and Treatment
  • Advanced agglomeration, automated dosing
  • ICMC compliant, safe and environmentally protected
Investment Highlights
  • Bankable, investment ready framework
  • Operational efficiency, risk mitigation
  • Meets UK market governance standards
  • Unlocks world-class resource potential in Indonesia
  • HSE and ESG compliant
  • Efficient process design, future expandable
  • Non-process facilities support workforce and operations
Housing
Central Kalimantan

EPC Housing Camp & Kitchen

Foldable Container
  • Platework
  • Rebar
  • Handrail
  • Steelwork
  • Roof work
  • Corridor
  • Sandwich Panel
  • Grating
Works On Site
  • Foldable Container
  • Anchoring & Installation of Structure
  • Mechanical Installation
  • Electrical Installation
Earth Works
  • Survey Elevation & Excavation
  • Rebar & Form Works
  • Truck Mixer Methodology (Cement, Sand & Gravel)
Engineering Discipline
CivilElectricalMechanical
Housing
East Kalimantan

EPC Steel Container Camp

2 Storey Camp · Steel 40 FT Containers (Modified to 2 Rooms with Toilet) · Including Civil Work
Specifications
  • 2 Storey Camp
  • Using Steel 40 FT Containers
  • Modified to 2 Rooms with Toilet
  • Including Civil Work
Works On Site
  • Modification Steel Container
  • Anchoring & Installation of Structure
  • Mechanical Installation
  • Electrical Installation
Engineering Discipline
CivilElectricalMechanical
Industrial
Mojosari, East Java

EPC NPK Fertilizer Plant

Rotary Drum 3.4 m diameter x 36 m long · 25 Conveyor Systems · Major Equipment Manufactured Inhouse
EPC Consultancy
  • Soil Work Investigation
  • Piling Analysis
  • Technical Study & Detailed Engineering
  • Bill of Quantity for Construction
  • Detailed Design & Plant Specification
  • Design Layout Mapping
Major Equipment Inhouse
  • Rotary Mixer
  • Drum Granulator
  • Rotary Drum (3.4 m diameter x 36 m long)
  • Rotary Coating Drum
  • Drum Boiler
  • 25 Conveyor Systems
  • Vibrating Screen
  • Chimney
  • Refractory
Auxiliary Equipment Supplied
  • Pumping Package
  • Ducting Package
  • Scrubber Package
  • Hopper Weighing
  • Automated Bagging System
Works On Site
  • Pre-Assembly
  • Anchoring & Installation of Structure
  • Mechanical Installation
  • Electrical Installation
  • Survey
Civil Work
  • Elevation & Excavation
  • Rebar & Form Works
  • Mobile Batching Plant (Cement, Sand & Gravel)
Engineering Discipline
CivilMechanicalProcessAutomationElectricalInstrumentation
Dry Test & Wet Test Commissioning
Industrial
Mojosari, East Java

Design & Build Briquette Heater Station

Briquette Heater Station · Maintain optimal humidity levels (<60% RH) in NPK storage/production areas
Scope of Work
  • Design a briquette heater station to maintain optimal humidity levels (<60% RH) in NPK storage/production areas
Parameter Specification
  • Heater Type: Briquette heater (solid fuel combustion)
  • Heat Output: 10-50 kW
  • Airflow: 500-2000 m³/h (forced convection)
  • Temperature Control: Thermostat-controlled (40-60°C)
  • Humidity Reduction: 20-40% RH reduction
  • Briquette Consumption: 1-5 kg/h
  • Safety Features: Overheat protection, fuel level monitoring
Layout
  • Locate station near NPK storage area
  • Ensure adequate ventilation and airflow
  • Install thermostat and humidity sensors
  • Provide fuel storage and handling area
Infrastructure
Paring Lahung, Central Kalimantan

EPC Infrastructure (Coal Washing Plant)

Coal Washing Plant Infrastructure · Bore Piling · Foundation Works
EPC Consultancy
  • Soil Investigation
  • Piling Analysis and Structure
  • Drawing (Civil, Mechanical, and Electrical)
  • Brand Specification
  • Bill of Quantity
  • Tender Documentation
  • Detailed Engineering Design
Facilities
  • Efficient Storage
  • Dedicated Spare Parts Area
  • Restroom
  • Secure Locker Area
  • Musholla
  • Parking Space
  • Essential Oil Trap
Works On Site
  • Pre-Assembly
  • Anchoring & Installation of Structure
  • Mechanical Installation
  • Electrical Installation
  • Elevation & Excavation
  • Rebar & Formwork
  • Mobile Batching Plant (Cement, Sand & Gravel)
  • Bore Piling
  • Foundation Works
Software
SAP 2000TeklaSolidWorksAutoCADKyroHelixCivil 3DTSOSketchUp
Engineering Discipline
CivilElectricalMechanicalStructural
Industrial
Palu, Central Sulawesi

Permanent Workshop & Office

1,200 sqm Warehouse · B3 Storage · International Safety Standards
Scope of Work
  • Main Workshop Bay & Office: Designed for high-performance workflows
  • Specialized Facilities: Epiroc storage, small tire repair workshop, and a dedicated Wash Bay
  • Infrastructure Excellence: 1,200 sqm warehouse, integrated storeroom, and Ready Lane
  • Safety & Compliance: Built to strict B3 storage and international safety standards
  • Full-Cycle Execution: From survey elevation and excavation to structural lifting and electrical systems integration
Integrated Workshop Feasibility
  • Workshop Bay
  • Workshop Office
  • Oil and B3 Storage
  • Epiroc Storage
  • Small Tire Repair Workshop
  • Wash Bay
  • Storeroom and Ready Lane
  • Bore Piling
  • Foundation Works
Works On Site
  • Pre-Assembly
  • Anchoring & Installation of Structure
  • Mechanical Installation
  • Electrical Installation
  • Survey Elevation & Excavation
  • Rebar & Form Works
  • Mobile Batching Plant
Software
TeklaSolidWorksAutoCADHelix
Infrastructure
Central Kalimantan

58 KM Mining Hauling Road

Gravel With Laterite Red Soil · 40-tonne Dump Trucks · 8-12m Road Width · CBR Curve Method (Atkinson, 1992)
General Requirements
  • Compliance with all relevant local and international standards for road construction
  • Adherence to pavement design parameters as outlined
  • Quality assurance through on-site testing (CBR, compaction, material gradation)
  • Environmental protection and safe working practices throughout construction
Pavement Design Criteria
  • Design Load: 40-tonne dump trucks (gross vehicle weight)
  • Road Width: 8-12 meters
  • Total Pavement Thickness: 30 cm
  • Design Method: CBR curve method (Atkinson, 1992)
  • Subgrade: In-situ soil with CBR < 6%
  • Base Course: Gravel C(7/10)
  • Surface Course: Gravel B(2/3)
Site Preparation
  • Clearing and Grubbing: Removal of vegetation, roots, stumps, debris, and organic material
  • Stripping Topsoil: Remove unsuitable topsoil to expose the subgrade
  • Earthworks: Cut and fill operations to achieve desired road profile and camber
  • Drainage cross fall/camber of ~3% to prevent water stagnation
Drainage & Geometry
  • Side Drains: Excavate trapezoidal side drains or construct lined V-drains
  • Culverts and Cross Drains: Install at low points or crossings
  • Horizontal Alignment: Maintained for alignment designed for the approved operating speed, vehicle swept paths, stopping distance and site traffic-management plan
  • Subgrade Preparation per design
Infrastructure
Pukun District, Sampit – Central Kalimantan

47 KM Hauling Road

Gravel With Laterite Red Soil · 40-tonne Dump Trucks · CBR Curve Method · Bulldozer Clearing & Grubbing
General Requirements
  • Compliance with all relevant local and international standards for road construction
  • Adherence to pavement design parameters
  • Quality assurance through on-site testing (CBR, compaction, material gradation)
  • Environmental protection and safe working practices throughout construction
Pavement Design Criteria
  • Design Load: 40-tonne dump trucks (gross vehicle weight)
  • Road Width: 8-12 meters
  • Total Pavement Thickness: 30 cm
  • Design Method: CBR curve method (Atkinson, 1992)
  • Subgrade: In-situ soil with CBR < 6%
  • Base Course: Gravel C(7/10)
  • Surface Course: Gravel B(2/3)
Clearing and Grubbing
  • Bulldozers used to remove vegetation and tree roots
  • Trim and compact the formation to the approved line and level
  • Cleared soil hauled by dump trucks to disposal area
  • As approved by supervising officer / contractor
Detailed Work Breakdown
  • Site Preparation (Clearing/Grubbing, Stripping Topsoil)
  • Subgrade Preparation
  • Drainage System (Side Drains, Culverts, Cross Drains)
  • Road Geometry and Safety (Horizontal Alignment)
Mining
Central Kalimantan

Design and Build Mining Plant Fencing 33 KM

Fabrication Inhouse
  • Galvanized Angle Bar
  • Galvanized Barbed Wire
  • Cement, Sand & Gravel
Works On Site
  • Land Clearance
  • Cut and Fill
  • Installation Work
  • Handling Local CSR
Mining
Sumbawa, West Nusa Tenggara

Design & Build Fencing (Conflict Zone)

Fabrication Inhouse
  • Galvanized Angle Bar
  • Hot-dip galvanised Barbed Wire
  • Cement, Sand & Gravel
Works On Site
  • Land Clearance
  • Cut and Fill
  • Installation Work
  • Handling Local CSR
Mining
Kalimantan

EPC Crusher Plant

Scope of Work
  • Steelwork
  • Platework
  • Rebar
  • Structure
  • Installation
  • Primary Crusher
  • Secondary Crusher System
  • On-Site Foundation Civil Work
Engineering Discipline
CivilElectricalMechanicalStructural
Commission Test
Marine
Jambi, Sumatera

Engineering Consultancy: CPO Mill and Port

30,000 DWT Jetty · CPO Mill & Port Consultancy · Feasibility & Master Plan
On Site Investigation
  • Topography
  • Bathymetry
  • Soil Investigation (onshore and offshore)
  • Oceanography (current and wave investigation)
  • River Tidal
Design Phase
  • Port and Maritime Development Consultancy (Feasibility and Master Plan)
  • Design and Analysis of 30,000 DWT Jetty including Dolphin, Mooring, and Berthing
  • Operational Flow from Land Transportation, storage tank, loading the CPO through piping installation to the Tanker Ship/Vessel
  • Operational Supporting Facilities
  • Warehouse, Workshop, Camp for staff and non-staff
  • Bill of Quantity and Tender Document
Engineering Discipline
Jetty EngineerCivilPipingMechanicalElectricalInstrumentation
Fuel & Tanks
Merauke, Papua

Design & Build Fuel Storage Tanks

Capacities: 25 KL, 35 KL, 50 KL, 62 KL · 50+ Units Delivered · TKDN Approved · Tecera Certified
Key Features
  • TKDN Approved — Meets local content requirements for the Indonesian market
  • Easy Mobility — Designed for easy transportation and relocation
  • Inbuilt Custom Fuel Dispenser — Standard flow-rate options of 40, 60 and 80 L/min, with engineered configurations up to 400 L/min
  • Tecera Certified — Complies with international safety and quality standards
Safety Features
  • Explosion-Proof Pump — Ensures safe and reliable fuel dispensing
  • Third-Party Testing Options — Available for additional quality assurance
  • Safety Lockable Door — Provides secure access and protection against unauthorized use
  • Customizable Features — Tailored to meet specific customer requirements
Success Stories
  • 50+ units successfully completed and delivered to valued customers
Available Capacities
25 KL35 KL50 KL62 KL
Fuel & Tanks
Merauke, Papua

ISO Tank Design & Build (25 KL × 10 Sets)

10 Sets × 25 KL ISO Tanks · Custom-built Fuel ISO Tanks · Engineered Fuel Dispensers
Services Include
  • Engineering Design & Concept Development
  • Procurement & Material Supply
  • ISO Tank Equipment & Fuel Dispensing Solutions
  • Fuel-transfer piping system
Fabrication & Construction
  • In-House Fabrication
  • Custom-built Fuel ISO Tanks 25 KL
  • Engineered Fuel Dispensers
  • Civil Structures
On-Site Installation & Integration
  • Seamless and Efficient Installation at the project site
  • Civil Engineering — Structural integrity & foundation design
  • Mechanical Engineering — Advanced fuel system design & integration
  • Electrical & Instrumentation Engineering — Safe & efficient automation solutions
Fuel & Tanks
Merauke, Papua

EPC Fuel Storage Tank – 2000 KL (500 KL × 4)

2,000 KL (500 KL × 4) · PT Global Papua Abadi · Hydrant Fire Protection · SCADA-Controlled Monitoring
Services Include
  • Engineering, procurement, and installation of a 2,000 KL (500 KL × 4) fuel storage and distribution facility for PT Global Papua Abadi
  • Storage tanks, fuel transfer systems, hydrant fire protection
  • Electrical and instrumentation systems
  • Safe, efficient, and reliable fuel handling infrastructure
Key Deliverables
  • Engineering design documentation
  • Fuel storage tanks installation
  • Fuel transfer piping network
  • Hydrant fire protection system
  • Electrical power distribution
  • Instrumentation and control systems
  • Safety systems and signage
  • System integration and commissioning
Pump Line
  • Transfer pump: 80 m³/h at 31 m head
  • Electric Fire Pump – 57 m³/h, 118 m
  • Diesel Fire Pump – 57 m³/h, 118 m
  • Jockey Pump – 12 m³/h, 23.6 m
Expert Engineering
  • Civil Engineering — Structural integrity, foundation stability & site development
  • Mechanical Engineering — Advanced fuel system design, installation & performance optimization
  • Electrical & Instrumentation — Smart automation & SCADA-controlled monitoring
Infrastructure
Murung Raya, Central Kalimantan

Gabion Retaining Wall

Scope of Work
  • Supply of Gabion Wire Mesh
  • Land Clearance
  • Anchor gabion baskets in accordance with the engineered slope-stability design
  • Boulder Material Manual Loading into Gabion Wire Mesh
  • Construct a gabion retaining and drainage system designed for the project-specific ground conditions
  • On-site Installation Works
Infrastructure
Lamongan

EPC Infrastructure

Entire Civil Work On Site · Installation · Inventory
Fabrication Inhouse
  • Rebar
  • Handrail
  • Steelwork
  • Roof work
  • Structural Work
Works On Site
  • Pre-Assembly
  • Anchoring & Installation of Structure
  • Mechanical Installation
  • Electrical Installation
Earth Works
  • Elevation & Excavation
  • Rebar & Form Works
  • Mobile Batching Plant (Cement, Sand & Gravel)
Software
TeklaSolidWorksAutoCADHelix
Engineering Discipline
CivilElectricalMechanicalStructural
Industrial
Gresik, East Java – 2021

DESCALING ACID TANK

Tank Capacity 8,000 m³ · Hazardous Location
Scope of Work
  • Descaling Tank Capacity 8000 m³
  • Conveyor System Methodology & Excavation
  • Engineering & Services
  • Hazardous Location
Conveyor
WEST SUMBAWA, WEST NUSA TENGGARA (NTB) – 2025

Tripper Car Conveyor

3 Units (Tables 26, 26A, 26B) · Design Standard AS 1755:2000 · Australian Design Rules (ADR)
Engineering & Design
  • Detailed engineering, fabrication, shop assembly, inspection, testing, and delivery of tripper car systems
  • Supporting structural components and mechanical assemblies required for proper functionality
Technical Specifications
  • Equipment: Conveyor Tripper Car (3 units – Tables 26, 26A, and 26B)
  • Function: Controlled discharge and distribution of bulk material from a conveyor system
  • Design Standard: Manufactured in accordance with AS 1755:2000 – Conveyors Safety Requirements and applicable Australian Design Rules (ADR)
  • Scope: Supply delivery and commissioning
Installation
  • Mechanical assembly
  • Rail alignment
  • Electrical wiring
  • Control integration with main conveyor
Documentation
  • Datasheets
  • O&M manuals
  • As-built drawings
  • Test reports
Testing & Commissioning
  • Mechanical / electrical checks
  • Functional tests
  • Load trials
  • Safety verification
Training
  • Basic operation and maintenance instruction for plant staff
Industrial
WEST SUMBAWA, WEST NUSA TENGGARA (NTB) – 2025

35-Tonne Ramp Door

35 Ton Capacity · Self-weight approximately 6,951 kg · Length 15.2 m · Width 1.6 m each
Engineering & Design
  • The Rexline scope covers design, fabrication, and delivery
35-Tonne Ramp Door Capacity
  • Structural Frame
  • Main Frame – WF300
  • Hinge
  • Weight tonnage: 6,951.20 KG
  • Length: 15.2 Meter in total
  • Width: 1.6 Meter per each
Industrial
Merauke, Papua

Hot Water Treatment

Sugarcane Seed Thermal Treatment · PLC & SCADA Automation · HMI for Real-Time Monitoring
Engineering & Design
  • Process engineering for sugarcane seed thermal treatment
  • Development of PFDs, P&IDs, equipment layouts, and control philosophies
  • Mechanical, electrical, and instrumentation (MEI) engineering
  • Safety interlock design and operational risk mitigation
  • PLC and automation system architecture
Procurement & OEM Fabrication
  • Supply and integration of boiler and heating systems
  • Fabrication of treatment tanks and thermal vessels
  • Pumps, valves, piping systems, insulation, and instrumentation
  • PLC, HMI, and control system hardware
  • OEM assembly and factory integration (where applicable)
Construction & Installation
  • Mechanical installation of boilers, tanks, pumps, and piping
  • Electrical power distribution and control panel installation
  • Instrumentation installation, calibration, and loop checking
  • Integrated MEI execution under strict HSE compliance
Automation, Control & Commissioning
  • PLC-based temperature and process control
  • Automated treatment sequencing and time control
  • Safety interlocks, alarms, and fault management
  • Operator-friendly HMI for real-time monitoring and control
  • Pre-commissioning and system readiness verification
  • Cold and hot commissioning
  • Functional and performance testing
  • Operator training and complete technical documentation handover
Industrial
Merauke, Papua

T-Workshop

Total Area = 13,360 m² · Zone A (Workshop with 6 Overhead Cranes) · Zone B (Fabrication) · Zone C (Tyre Workshop & Warehouse) · Zone D (Three-Storey Office)
EPC Consultancy
  • Soil Investigation
  • Piling Analysis and Structure
  • Plant
  • Drawing (Civil, Mechanical and Electrical)
  • Specification
  • Bill of Quantity
  • Tender Documentation
  • Detailed Engineering Design
Integrated Workshop Feasibility
  • T workshop Zone A (workshop with 6 overhead crane) 82 m × 40 m = 3,280 sqm
  • Zone B (fabrication building) = 60 m × 42 m = 2,520 sqm
  • Zone C (tyreshop and warehouse building) = 60 m × 42 m = 2,520 sqm
  • Zone D (Three-Storey Office) = 42 m × 40 m × 3 floor = 5,040 sqm
  • Total Area = 3,280 + 2,520 + 2,520 + 5,040 = 13,360 m²
Works On Site
  • Pre-Assembly
  • Anchoring & Installation of Structure
  • Mechanical Installation
  • Electrical Installation
Software
SAP 2000TeklaSolidWorksAutoCADKyroHelixCivil 3DTSOSketchUp
Engineering Discipline
CivilElectricalMechanicalStructural
Mining
Timor Leste

50 MTPA Limestone Mining, Crushing & Port Facility

50 MTPA · 12,000 TPH Ship Loading · 4 Dedicated Berths · 200,000 DWT Capable · Apollo Project
Consultant / Engineering
  • Rexline Engineering was responsible for the end-to-end engineering design and integration of the Apollo Project
  • Covering mining infrastructure, material handling systems, and port facilities
  • To support phased production from 10 Mtpa to 100 Mtpa
Design Capacity
  • 50 Million Tonnes Per Annum (MTPA)
  • 12,000 TPH ship loading system
Design & Engineering Consultant
  • Master planning and export corridor layout
  • Crushing plant and mine interface engineering
  • High-capacity conveyor, stockyard, and transfer systems
  • Port, jetty, and marine infrastructure design
  • Operability, throughput, and future expansion planning
Ship Loading & Port
  • 12,000 TPH loading facility
  • Engineered for rapid vessel turnaround and minimized demurrage
  • 4 dedicated berths
  • Vessel handling capability for: 200,000 DWT, 100,000 DWT, 50,000 DWT, 10,000 DWT (barge operations)
Materials Handling
  • 4 high-capacity conveyor lines
  • Integrated crushing and stockpile feed systems
Infrastructure
Central Kalimantan

Engineering Design & Supervision (Mess, Tunnel, and Fuel Facilities)

500-Person Worker Mess · Drainage Tunnel Across 3 Rivers · Fuel Tank Facilities · Floating Jetty
Consultant / Engineering
  • Provision of Design, Engineering Consultancy, and Supervision Services for the Development of a 500-Person Worker Mess
  • Drainage Tunnel Traversing Three Rivers
  • Fuel-storage facilities, including the loading/unloading jetty, transfer system and associated infrastructure
Scope of Services
  • Feasibility Study & technical validation
  • Concept & preliminary engineering
  • Constructability-driven design optimization
  • Technical advisory through construction phase
Infrastructure & Connectivity
  • Drainage systems and bridgeworks across three locations
  • Flood-resilient and terrain-responsive design
Integrated Community Development
  • Master planning of a 550-person community
  • Full utilities design: MEP, telecom, water supply, wastewater & treatment
Energy & Marine Facilities
  • Design of fuel storage facility
  • Engineering of a dedicated floating jetty for safe fuel operations
Industrial
Solo, Central Java

Hospital Project (17 Floors, 39,980 m²)

17 Floors · 39,980 m² · Multi-disciplinary building delivery with substantial MEP and life-safety system content
Scope of Work
StructureArchitectureMechanicalPlumbingElectricalElectronic / ELVElevatorsHVACFire System
Relevance to Qualification
  • Demonstrates capability in large, technically coordinated, multi-disciplinary building delivery
  • With substantial MEP and life-safety system content
Built In Indonesia · Delivered Across Asia
31 delivered EPC projects spanning marine, mining, infrastructure, housing, fuel, and industrial sectors. From Kalimantan jungles to Timor Leste ports.